Here is a complete new ice rink chiller we installed. Two cranes were set up in the machine room to faciltate the removal of the old chiller and the installation of the new larger unit. The old evaporative condenser was removed from the roof and a new larger evaporative condenser was placed on a large stand adjacent to the building.